Installation
Observe the flow direction
arrow on the body. Install in the pipeline with
the proper flow direction, taking care to
install in a location which will remain full for
liquid installations.
Loosen,
but do not remove the #6-32X1/4 Phillips Pan HD
screw which secures the enclosure cap. Twist the
cap slightly counterclockwise and pull cap off
to gain access to the terminal strip and
adjustment screws. Connect wiring through the
provided hole in the cap and connect to terminal
strip. Provide sufficient service loop to permit
removal and reinstallation of cap without
disconnecting wiring.
If fitted
with two switches, each switch is independently
settable. Choose normally open or closed as
desired to provide fail safe operation.
Adjustments
Adjustments are made by rotating the adjusting
screw clockwise to raise the set point or
counterclockwise to lower the set point. Use the
green mark on the adjustment disc as a
reference. Factory setting is at 30% of full
scale for switch #1 and 95% of full scale for
switch #2. Important: Clockwise from
standard factory setting.
|
Adjustment Screw Turns |
% of Full Scale |
| 0 |
30 |
| 1/2 |
60 |
| 1 |
80 |
| 1 1/2 |
90 |
| 2 |
100 |
To set
switches accurately, connect a continuity tester
to the common and the selected normally open or
normally closed contact. Establish flow at the
desired set point and turn the adjusting screw
until switching occurs. Increase and decrease
the flow rate and verify desired set point
switching.
Ratings
| Contact
Rating |
10 watts |
| Voltage |
175Vdc max. |
| |
125Vac max. |
| Current |
350mA max switching |
N.C.
Ratings based on resistive
loads.
Contact factory for
recommendations when switching inductive loads.